Here are some interesting but otherwise
totally useless facts about the Moorestown WWTP
1) The facility
took 22 months to construct.
2) There
is over 14,000 feet of pipe buried in the ground.
3) The
atmosphere in the digesters is very similar to the atmosphere on the planet
Saturn.
4) Over
6000 cubic yards of concrete was used in construction.
5) The
Emergency Generator puts out enough electricity to run over 200 homes.
6) There
are 23 miles of electrical wires throughout the facility.
7) There
are 6,000,000,000,000 protozoa in the Aeration Basins (that's six trillion).
8) 50,000
cubic yards of dirt was moved during construction.
9) The
plant is designed to treat over 1.25 billion gallons of wastewater every
year.
10) At average
flow, a gallon of water takes 12.8 hours to travel through the plant.
Sewer Sam is the "Offical"
game of the Moorestown Wastewater Treatment Plant